JCT Major project construction contract
The term ‘major project’ typically refers to; ‘A bespoke project, programme or portfolio characterised by its complexity, level of investment and stakeholder involvement. Such a project is likely to have its own project control office established and have a dedicated project team under the direct control of a nominated person.' (Ref GRIP Manual, Introduction to the Project Management manual, published by Network Rail in 2006).
Major project construction contracts (such as JCT MP 2016), are intended for use by employers who are involved in procuring large-scale construction projects.
JCT MP 2016 is a design and build contract, under which responsibility for the design, as well as completing the construction works, lies with the contractor.
The design can be produced by the contractor from the outset, using specialist designers or an in-house team; or it can be produced based on a concept provided by the employer’s advisers. If the initial concept is prepared by the employer's advisers, they may then be novated to work for the contractor to develop the detailed design and inspect the construction works as they proceed.
The employer will have prepared employer's requirements on which the contractor can base their design, and the employer will usually appoint an employer's representative to exercise their powers and functions.
The contract is suitable for use on framework agreements, and for both the public and private sector. It may also be used with a Pre-Construction Services Agreement (General Contractor) (PCSA) or Pre-Construction Services Agreement (Specialist) (PCSA/SP).
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.